heres what i guess the process is:
1. Get the cage in and level so i can mark the holes.
2. Take the cage out and drill the holes.
3. Then get the cage back in and bolt it in.
It sounds simple, it should be simple but i reckon its going to be a right b****rd to get right.
So i need to clear up a couple of things:
I'v been told i need to do the arches first because if you do the bins first the arch mountings won't line up. Correct?
I guess the holes i drill just go straight through the floor pan, sill etc, all the way through until i can see my driveway through then? Then the bolts must be about 4" long or something and go up right through the floor, into the car and you just tighten the nuts up on them?
Then the same with the arches?
Aren't i going to need either like a foot long drill bit or a small enough drill to fit into the rear bin?
All of the above is just me assuming thats what you do, so i just want to make sure i know how to do it before i start drilling holes everywhere
Anything else i should know about while i'm fitting it?
Thanks in advance

Edited by minimadmike, 21 September 2007 - 10:01 PM.