All glass in, locking strips cut and tidied up. Drivers door weather strips installed, all levers put on and connected to latch. Just waiting on a small parcel from minispares with door handle gaskets before I can put door cards on properly.
Front hub studs swapped out for shorter ones, wheels put onto car and pallet removed. It's on axles stands until the front to rear pipes and battery cable are finished, then it could be lowered onto it's wheels....but one tyre has gone down, not sure if it's the valve or the tyre bead.
Front number plate, seat locking bars, handbrake lever and cable, drivers side floor bungs and underlay. Need to find 1 bung that has gone AWOL and refill my mini gas torch for heating the seal to finish passenger side.