Everything done this morning was done in the lead up to this moment
So that was
Fill with Oil
Fill with coolant
Finish fuel lines and overflow
make up and fit clutch master to slave pipe
Add petrol
Then this afternoon was spent finishing building up the n/s hub
And then i adjusted the rear suspension and ten greased the ball joints, radius arm pins and top arm pins.
Wheels going on tomorrow after the brakes are bled and then it can go outside for a piccy.
Cheers
Ben
Edited by Ben_O, 17 October 2016 - 06:02 PM.