That's such a cool repair, it looks seamless and you can't even see the welds.
Mill Road Garage, Isle Of Wight. Classic Car Restoration Services
#166
Posted 26 October 2018 - 03:45 PM
#167
Posted 26 October 2018 - 05:03 PM
Just wonderful to watch and seethe improvement.
#168
Posted 06 November 2018 - 05:55 PM
The boot floor is nearing completion now and the valance closing panels are fitted too.
I have also rebuilt the n/s radius arm, fitted new hydro pipe sleeves and a new rebound buffer. Gave everything a check over and degreased the entire subframe assembly.
Ill post up pictures soon, things have been rather hectic lately!
#169
Posted 06 November 2018 - 05:59 PM
Hi Ben, how was the radius arm? I've been filling it with grease for a few years as the inner tube thing was split Glad the hydro pipe sleeves are back on now. Was there one on there on one side?
Paul
#170
Posted 06 November 2018 - 06:42 PM
Hi Ben, how was the radius arm? I've been filling it with grease for a few years as the inner tube thing was split Glad the hydro pipe sleeves are back on now. Was there one on there on one side?
Paul
Hi Paul.
The radius are was fine. I cleaned it all right out replaced the split tube and the needle roller bearing and re-assembled it to the sub frame.
There wasn't a hydro pipe sleeve on either side but i did notice that there should be a retaining plate which I was going to contact you about and find out of you wanted them.
They are http://minispares.co...|Back to search
I noticed that the outer braiding on one of the hydro pipes is worn but as its part of the displacer and they are NLA, there isn't much we can do unfortunately.
It isn't damaged much though so will be fine I expect.
Cheers
Ben
#171
Posted 06 November 2018 - 06:58 PM
Hi Ben, OK for the Hydro retainers, lets get it right. I have a set of spare hydro units. You can get them re-hosed but I'll cross that bridge when it comes! WOuld you be able to send me a photo of it sometime?
Looking forward to the next photo install.
Paul
#172
Posted 06 November 2018 - 08:13 PM
Hi Ben, OK for the Hydro retainers, lets get it right. I have a set of spare hydro units. You can get them re-hosed but I'll cross that bridge when it comes! WOuld you be able to send me a photo of it sometime?
Looking forward to the next photo install.
Paul
Ill get those ordered then.
Ill get a snap of the damaged hose and send it through.
Cheers
Ben
#173
Posted 07 November 2018 - 01:00 PM
Here is a photo of the worn braiding on the hydro hose.
As previously said, I removed the left radius arm
And then after sorting out the grease tube, it was re-assembled
And then the whole lot was de-greased
And the boot floor is getting there now. I have straightened it as much as I can. the boot board brackets have now been welded in and I had to make up some new loom tabs to fit as the existing ones had fatigued on the fold and were about to snap
Cheers
Ben
#174
Posted 07 November 2018 - 06:06 PM
Wow what a transformation!!!! shame to put the boot lid back on
#175
Posted 07 November 2018 - 10:01 PM
Wow what a transformation!!!! shame to put the boot lid back on
It's 100 times better than it was but that nasty rear section that had been previously fitted could only be straightened out so far.
But it's sound and tidy now and nice to see the back of the random drilled holes here and there
#176
Posted 08 November 2018 - 08:51 AM
#177
Posted 12 November 2018 - 10:46 AM
Valance closers done
Seat belt mount holes welded up
And the front panel support bar has been corrected
And that completes the panel work.
Next up will be prep and paint
Cheers
Ben
#178
Posted 12 November 2018 - 07:25 PM
Super work Ben, really spectacular!!
#179
Posted 15 November 2018 - 02:33 PM
Bit more done on the 's'
I finished the underside cleanup and sealed up the valance closing panels so masked up and applied some stonechip
And then followed some fresh topcoat
Ben
#180
Posted 15 November 2018 - 06:24 PM
Fan daby dozy Ben
1 user(s) are reading this topic
0 members, 1 guests, 0 anonymous users