Hi All;
Probably asked this question before but cannot for the life of me find it. I have half completed a repair of the boot floor but now need to remove the subframe to weld / paint the underneath of the boot floor.
I am also going to renew the Left and Right Sills and Left Hand Front Floor Pan.
I have bought a couple of Heel Board Repair Panels in case I find damage when I remove the Sub Frame (I am sure I will).
Question:
If I am repairing the Left and Right ends of the Heel Board and also replacing the Sills what order do I do them, do I fit the sills before the heel boards ends or fit the heel board ends before the sills i.e what goes on top of what? Or does it not matter?
Thanks