Suspension raised, handles painted, mouth meshed. Sorted out all of the interior trim so that the 3 door MG Metro carpet actually fits snug with no gaps. Nice new number plates among many other things I'm no doubt missing. Alternator removed, manifold removed ready for the new timing belt/water pump/alternator.
Got the rear spoiler drilled up and fitted ready for Simon to paint it some time in the next month.
I bought a set of older style clocks for the speedo. They're wired differently between the A and K series so we're eventually going to rewire the connectos so that I can use the whole binnacle including the rev counter etc
and I bought these on Ebay
We're going to be doing the cambelt after L2b and a mad rush to finish Simons Mini for it, which still needs the engine putting back in, MOT and tracking in 4 days FUN.
and then MOT for Rita. Plan is that at the start of June they'll both be driving and we'll be driving together AT LAST
Edited by Mini-Mad-Craig, 07 May 2014 - 01:44 PM.