
Then fitted the battery cable and secured it. Just need to put on the end for the cut off switch


Also had to mount the seat belt points in a different place as the position of the new seat and the new rails blocked the old mounts. These will be welded from underneath before any events. I secured all the brake and fuel "p" clips with Allen bolts bolted from the outside so they can be moved out of the way when I do weld the anchorage points

And finally modified the rear seat so that the pipe work has plenty of room under the seat
