started by blocking off the gear linkage hole in the tunnel as ill be making my own internal lnkage set-up


then i started to tubb the N/S arch.
i made up a pattern of the inner arch from some welding wire and transferred it to the quarter panel. i next cut slices into the panel as far as the line

then i bent the slots up to 90 degrees and began to fit the strip of metal to reform the arch


and one almost finished tubbed arch

thanks for looking
Ben