radiant floor hoses done.
pouring the concrete:
i've added 5 bags of black pigments to 6 cubic meters of concrete. according to the samples i had, to end up with black concrete i would've needed 3 bags per cubic meter, which means 18 bags - but at 70$ per bag (about £42) i decided 5 bags would be enough. it should become dark enough when i polish it and apply the sealer.
i'm very pleased with the result, but i do expect it to crack around where the division boards are laid down (the boards are there so that we build the walls on them instead of nailing in the concrete - and poking holes in the radiant tubing!). if it does crack, its just a matter of filling the crack with a mix of sand, epoxy and dark pigment. i will wait a couple days and then i will wet-polish it with diamond pads with grit ranging from 150 to 3000, it will become as slick as granite.
tomorrow is a big day, the garage is coming !!!!
#32
Posted 25 August 2010 - 12:07 PM
Good luck with the garage
#33
Posted 25 August 2010 - 12:48 PM
#34
Posted 25 August 2010 - 05:09 PM
#35
Posted 25 August 2010 - 05:26 PM
#36
Posted 25 August 2010 - 07:21 PM
#37
Posted 26 August 2010 - 12:55 AM
if you notice where all the ducts are we made a division where no concrete was poured so that the ducts, drains and electrical stuff can go trough to the basement. good tip on the wireless connection, i'll make a note to run some wires before closing the walls!!!
this picture was taken at noon today:
and this one at 3PM:
doesnt look like much on photo, but its 25ft x 30ft. i will install a single 14ftx7ft garage door.
cant wait to bring the clubby back home, i miss it so much...
#38
Posted 26 August 2010 - 01:58 PM
by the way the rest of the house is looking really good -
#39
Posted 26 August 2010 - 03:40 PM
eeeek ! that went up quick did that garage - how long before you can get the clubby in it ?
by the way the rest of the house is looking really good -
thanks!
i'd say in 3 weeks i should have all the doors and windows installed so i'll be able to bring the clubby in!
#40
Posted 09 September 2010 - 12:11 AM
the staircase from outside
the staircase from inside
ground floor
top floor
the rough electrical is done, rough plumbing is 80% done. most of the windows should be done by the end of next week, after that we'll be able to close down the walls!
its very exciting to have something this big come out of your head... it hurts a bit, but sometimes (like today) you get peeks of the finished product and it feels great
#41
Posted 09 September 2010 - 12:15 AM
#42
Posted 09 September 2010 - 08:57 PM
JR
#43
Posted 09 September 2010 - 09:12 PM
#44
Posted 11 September 2010 - 12:54 PM
That's a beautiful invisible staircase, state of the art?
yes, unfortunately it only goes down at the moment, i have to get it fixed.
JR - it will mostly be charcoal colored acrylic with orange cedar in specific places like the basement wall, underneath the balcony, and in the recessed area in front. the garage door will also be covered in cedar. hope it doesnt make it too heavy for the door opener motor...
off to ikea for bathroom stuff. i hate shopping at ikea, but i make up for it by stealing lots of little wooden crayons...
#45
Posted 11 September 2010 - 01:47 PM
1 user(s) are reading this topic
0 members, 1 guests, 0 anonymous users