Put the glass on the stack unit
Made the brackets to hold it in place
Drilled the shift light (top right) and wired it up.
Drilled the warning light (top left) and wired it up.
Drilled both left and right indicators (below the stack) and wired them up. Spaced them out so if required I can add a couple more.
The dash is completed:

Started making the bracket for the ecu monitor and the switches. It mounts off the rear of the gear selector housing:

But blimey things just take soo long to do... Still no word about the exhaust and header tank, which were promised this week, which unfortunately people, means no starting videos this weekend.